Ref. No. [UMCES] CBL 2016-015
ACT VS16-06
43
A cross-plot of the matched observations for the first month of deployment is given in
figure 9. Comparisons were limited to one month as a representation of a typical field deployment
and to focus on initial instrument offset versus impacts of biofouling during an extended
deployment. A linear regression of the subset data (r
2
= 0.95) had a slope of 1.0 and intercept of -
0.107.
Figure 9.
HIMB field response plot of EXO2 compared to reference DO samples determined by Winkler
Titration. The plotted line represents a1:1 correspondence.