Ref. No. [UMCES] CBL 2016-012
ACT VS16-03
35
The calculated drift rate in instrument response for the entire deployment period was -0.079
mg/L/d (r
2
= 0.49; p<0.0001).
In contrast, the drift rate for the first 35 days of the deployment was
much less, averaging only -0.016 mg/L/d (r
2
= 0.54; p<0.001). In both cases the rate would
include any biofouling effects as well as any electronic or calibration drift.
Figure 5.
Time series of DO measured by the SBS HydroCAT during the 12 week CBL field trial.
Top
Panel
: Continuous DO recordings from instrument (blue line) and DO of adjacent grab samples determined
by Winkler titration (red circles).
Bottom Panel
: Difference in measured DO relative to reference samples
(Instrument DO mg/L – Reference DO mg/L) observed during deployment.