Ref. No. [UMCES] CBL 2016-011

ACT VS16-02

37

The calculated drift rate in instrument response for the entire deployment period (using the

accepted data in Fig 5) was -0.026 mg/L/d (r

2

= 0.83; p<0.001). If we consider only the first 35

days of the deployment before any indication of a malfunction, the drift rate was only -0.009

mg/L/d (r

2

= 0.34; p<0.001). In both cases the rate would include any biofouling effects as well as

any electronic or calibration drift.

Figure 5.

Time series of DO measured by the PME miniDOT during the 12 week CBL field trial.

Top

Panel

: Continuous DO recordings from instrument (blue line) and DO of adjacent grab samples determined

by Winkler titration (red circles).

Bottom Panel

: Difference in measured DO relative to reference samples

(Instrument DO mg/L – Reference DO mg/L) observed during deployment.