Background Image
Previous Page  25 / 58 Next Page
Information
Show Menu
Previous Page 25 / 58 Next Page
Page Background

Ref. No. [UMCES] CBL 2015-011

ACT VS15-04

25

RESULTS of MOORED FIELD TESTS

Moored field tests were conducted to examine the performance of the In-Situ Troll 9500

pH sensor to consistently track natural changes in pH over extended deployment durations of 4-8

weeks. In addition, the field tests examined the reliability of the instrument, i.e., the ability to

maintain integrity or stability of the instrument and data collections over time. Reliability was

determined by quantifying the percent of expected data that was recovered and useable. The

performance of the Troll 9500 was examined in four separate field deployment tests at various

ACT Partner test sites to include a range of biogeochemical conditions. The range and mean for

temperature and salinity for each test site is presented in Table 2. The final reference

temperature data was computed from the mean of two RBR thermistors and the SeaBird SBE

that were mounted at the same sampling depth as the test instrument. The reference temperature

data and salinity were used to compute ambient pH results from the laboratory results using a

CO2-Sys program (Pierrot et.al. 2006). Immediately before each deployment the test instrument

was exposed to a certified or internal reference sample for 3-4 measurements to confirm good

working status and provide an initial offset against its latest calibration (Table 3).

Table 2

. Range and average for temperature, and salinity at each of the test sites during the sensor field

deployment. Temperature and salinity were measured by two RBR temperature loggers and a SeaBird

SBE 26 (or SBE26plus) mounted on the instrument rack and the duration of the deployment.

SITE

(deployment period/duration)

Temperature

(

0

C )

Salinity

Moss Landing Harbor

Min.

14.9

30.7

26Aug – 22Sept

Max.

18.6

33.7

(n = 28 days)

Mean

16.6

33.0

Kaneohe Bay

Min.

22.3

32.8

15Nov – 10Feb

Max.

26.5

35.2

(n = 88 days)

Mean

24.5

34.4

Chesapeake Bay

Min.

3.4

9.3

12Mar – 10Apr

Max.

10.1

14.0

(n = 30 days)

Mean

5.9

12.8

Lake Michigan

Min.

11.6

0.024

21Jun – 19Jul

Max.

24.9

0.035

(n = 29 days)

Mean

21.2

0.031

Table 3.

Results of the pre-deployment check for the Troll 9500 at each deployment site. The stated pH

of the reference solution is based on ACT’s spectrophotometric analysis completed at the time of

exposure. Seawater CRM was provided by Andrew Dixon’s Lab (Scripps Institution of Oceanography).

NIST buffer was prepared by ACT from salts supplied by Kenneth Pratt, NIST.

Deployment Site

Ref Solution

Measurement

Temperature

Reference

Solution pH

Instrument pH

MLML

Seawater CRM

20

o

C

7.97

7.99

HIMB

Seawater CRM

25

o

C

7.86

7.94

CBL

Seawater CRM

20

o

C

8.00

7.95

GLERL

NIST Buffer

20

o

C

9.23

9.21