Previous Page  46 / 73 Next Page
Information
Show Menu
Previous Page 46 / 73 Next Page
Page Background

Ref. No. [UMCES] CBL 2016-010

ACT VS16-01

46

A cross-plot of the matched observations over the entire deployment is given in figure 3.

Comparisons were limited to one month as a representation of a typical field deployment and to focus

on initial instrument offset versus impacts of biofouling during an extended deployment. A linear

regression of the data (r

2

= 0.99) produced a slope of 1.053 and intercept of -0.491.

Figure 3

. MTU GLRI field response plot of a JFE AROW-USB DO instrument compared to reference DO

samples. The plotted line represents a 1:1 correspondence. (Yellow circles denote adjusted reference values).