RESULTS of MOORED FIELD TESTS

Moored field tests were conducted to examine the performance of the PME miniDOT to

consistently track natural changes in dissolved oxygen over extended deployment durations of 11-

18 weeks. In addition, field tests examined the reliability of the instrument, i.e., the ability to

maintain integrity or stability of data collection over time. Reliability was determined by

quantifying the percent of expected data that was recovered and useable. The performance of the

PME miniDOT was examined in three separate field deployment tests at various ACT Partner sites

to include a range of biogeochemical conditions. The range and mean for temperature and salinity

for each test site is presented in Table 5. The final reference temperature data was computed from

the mean of two RBR thermistors and a SeaBird SBE that were mounted at the same sampling

depth as the test instrument. Immediately before each deployment the PME miniDOT was

exposed to a laboratory reference tank for 3-4 measurements to confirm good working status and

provide an initial offset against its latest calibration (Table 6). In all cases the miniDOT was

calibrated at the factory by the manufacturer.

Table 5

. Range and average for temperature, and salinity at each of the test sites during the sensor field

deployments. Temperature and salinity were measured by at least 2 RBR temperature loggers and a

SeaBird SBE 26 (or SBE26plus) mounted on the instrument rack for the duration of the deployment.

SITE

(deployment period/duration)

Temperature

°

C )

Salinity

Keweenaw Waterway

Min.

0.04

0.0

9Jan – 22Apr

Max.

5.2

0.01

(n = 104 days)

Mean

0.7

0.01

Chesapeake Bay

Min.

19.3

4.7

20May – 5Aug

Max.

36.7

13.7

(n = 78 days)

Mean

25.6

10.9

Kaneohe Bay

Min.

23.1

27.3

24Sep – 21Jan

Max.

29.1

34.7

(n = 121 days)

Mean

25.8

33.4

Table 6.

Results of the pre-deployment check for the PME miniDOT for each deployment site. The DO of

the reference solution is based on the mean of three Winkler titrations of the reference tank during the

exposure. Ambient water was used for the reference solution at each deployment site.

Deployment Site

Reference

Solution

Measurement

Temperature

Reference Solution

DO (mg/L)

Instrument

DO (mg/L)

MTU

Site Water

11.7

o

C

10.193

10.33

CBL

Site Water

21.6

o

C

7.983

7.87

HIMB

Site Water

26.6

o

C

6.547

6.65